Syscont Ltd.

Steam and power generation

1. "Toplofikatsiya Plovdiv Sever" AD - Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at Boiler No.2 – 1993-1996 and consecutive modifications - 1999

 Honeywell TDC 3000 System - Local Control Network (LCN) – 1993-1996, 1999, connecting the following equipment:

 - Universal Stations (US);

 - History Module (HM);

 - Application Module (AM);

 - Network Interface Module (NIM) and

Universal Control Network (UCN), connecting

 - Advanced Process Managers (APM).

  

2. OC "Mladost" EAD – Vratsa - Design, programming, implementation, commissioning and start up of a Distributed Control System (DCS) at CH Boilers – 1995-1996

 - Honeywell Plantscape SCADA System;

 - Controllers Series 9000.

 

3. TEC "Bobov dol" AD - Design, programming, implementation, commissioning and start up of Distributed Control Systems (DCS) at Power Generation Units No.1, 2 and 3 – 2000-2004

Honeywell TPN 3000 System - Local Control Networks (LCN), connecting the following equipment:

 - Global Universal Stations (GUS);

 - History Module (HM);

 - Process History Data (PHD);

 - Application Node (APP);

 - Network Interface Module (NIM) and

Universal Control Networks (UCN), connecting the following equipment:

 - High Performance Process Managers (HPM);

 - Fail Safety Controllers (FSC).

4. TEC "Maritsa Iztok 2" EAD - Design, programming, implementation, commissioning and start up of Distributed Control Systems (DCS) at Power Generation Units No.1, 3 and 4 – 2006-2009

 - Honeywell Experion EPKS System;

 - Profibus Interface;

 - Controllers C200;

 - Safety Managers (SM).