| Oil Field Tengiz – Kazakhstan - with Honeywell UK - SGP |
|
Design, programming, Factory Acceptance Test (FAT), implementation, commissioning and start up of SGP-Second Generation Project – 2004-2006 Honeywell TPN system - Local Control Network (LCN), connecting the following equipment: - Global Universal Stations (GUS); - History Modules (HM); - Application Node (APP); - Network Interface Module (NIM) and Universal Control Network (UCN), connecting: - High Performance Process Managers (HPM); - ICS Triplex safety controllers.
|










